🌍 Engineered for West Africa — Côte d’Ivoire · Ghana · Burkina Faso · Senegal · MaliTalk to an engineer →
🇳🇬 Tomato · Nigeria

Tomato drying systems in Nigeria

What the crop demands, what the country imposes, and what that means for capacity.

Nigeria loses an enormous share of its tomato crop between field and market — the standard figure quoted in the sector is around half — while simultaneously being one of the world’s largest importers of tomato concentrate. The two facts sit next to each other every year and the gap between them is a drying problem.

Tomato drying systems in Nigeria🌾Tomato⚖️Intake & grading20.0 t/d♨️Hot air55–62 °C⏱️Cycle18–26 h🔬Final moisture10–14 %📦Pack14 : 1
Tomato drying systems in Nigeria

The situation in Nigeria

The domestic market is the story. Two hundred million consumers mean a processor can build a serious business without ever exporting, which changes the specification: buyers want volume, price and consistency rather than EU documentation. Power is the binding constraint almost everywhere, and a heat source that does not depend on the grid is not a sustainability choice here but an operational one.

Growing regions. Kano, Kaduna and Kebbi in the north, Oyo and Ogun in the south-west, the Niger delta

What tomato drying demands

Tomato has the harshest yield ratio of any crop on this site: fourteen tonnes of fresh fruit for one tonne dried. That makes intake logistics, not drying, the binding constraint — and it also means a glut that would otherwise rot in the field is exactly the raw material this process wants.

Harvest calendar

February to April in the northern producing states around Kano and Kaduna, with a second smaller window in November and December. The February-to-April glut is when roadside prices collapse.

The working campaign window as the trade runs it. It shifts a fortnight either way with the rains.

Process parameters

ParameterValue
Drying temperature55–62 °C
Final moisture10–14 %
Yield (fresh : dried)14 : 1
Cycle time18–26 h

Sizing starting points from ordinary processing practice, not a validated recipe for your product. Confirm against your own intake and your buyer’s specification.

Worked sizing example

For a unit taking 20 tonnes of fresh product a day, at a yield of 14 : 1:

20.0 t/dayDaily intake (fresh)
1.4 t/dayDaily output (dried)
≈ 143 t (100 days)Output across the campaign
18–26 hCycle time

Illustrative figures calculated from the yield and campaign window above. They size a conversation; they do not describe any existing installation.

Fuel available in Nigeria

Palm kernel shell in the south-east, rice husk in Kebbi and the north, and an unmatched cassava peel resource — wash it before use.

  • Base load. Palm kernel shell · Rice husk · Cassava peel
  • Supplement. Cashew shell · Corn cob · Sawdust · Cocoa pod husk

See all 27 fuels and their properties

Market and buyer requirements

Domestic, substituting directly for imported concentrate and supplying the sauce, restaurant and food-processing trade. This is import substitution at national scale rather than an export play.

Explore further

The systems that hold this profile

Other crops in Nigeria

Tomato drying elsewhere

Frequently asked questions

Why does Nigeria import concentrate while losing its own crop?

Because the crop and the demand are separated in time and the product cannot bridge the gap. Roughly half is lost between field and market; dried at 14 : 1 to 10–14 % moisture, the February-to-April glut becomes a stable product that supplies the rest of the year.

Is 20 t/day large for tomato?

It is mid-size, and it produces only about 1.4 tonnes of dried product a day — tomato has the harshest ratio of any crop here. Intake handling, not chamber capacity, is what has to be designed for on this crop.

Why dry rather than build a paste plant?

Capital and cold chain. Paste needs sterile filling, canning and distribution infrastructure; dried tomato at 55–62 °C over an 18 to 26 hour cycle needs none of it and is stable at ambient temperature — a far lower entry point into the same demand.

Size a unit in Nigeria

Tell us your daily fresh volume and target output, and we will size the chambers, the burner and the fuel available around your site.

Request a quote