A biomass dryer manufacturer designs, builds, installs and commissions the whole thermal chain: burner, hot air generator and drying chambers. SahelDry — a brand of GreenMach International Commerce Co., Ltd. — does that across a 200,000 to 900,000 kcal/h range, under a single contract.

What we manufacture

EquipmentRange
Multi-fuel biomass burners200,000–900,000 kcal/h
Cashew shell burners200,000–900,000 kcal/h
Steam boiler firing systems200,000–900,000 kcal/h, boiler not supplied
Hot air generators2,500–3,000 m³/h at 50–150 °C
Tunnel dryers1,500 kg per standard chamber
Panel drying rooms4,968 kg fresh mango per line batch
Batch processing units100–500 kg, fast changeover
Briquetting linesFrom your own crop residue

The core of the range is the biomass hot air generator, the cashew shell burner and the industrial tunnel dryers, assembled into a complete integrated system or supplied separately.

Our scope of supply

In our supply

  • Design and sizing from your product and your tonnage
  • Manufacture and quality control
  • Sea packing and export documentation
  • Installation supervision on site
  • Commissioning and performance testing
  • Operator and maintenance training
  • Full documentation: manuals, maintenance schedules, spare-parts lists

The buyer’s responsibility

  • Civil works, foundations and the floor slab
  • Electrical supply to the panel terminals
  • Water supply to one connection point
  • Customs clearance and inland transport
  • Erection and lifting labour on site, under our supervision
  • Outside West Africa: the team’s travel, accommodation and entry formalities
We publish what we do not do as plainly as what we do. A quotation drawn up without these boundaries always ends in variation orders. The final scope is confirmed in writing with the proposal.

Where we install

West Africa is the market these systems are engineered around and where most of them go: Burkina Faso · Côte d’Ivoire · Ghana · Senegal · Mali · Togo · Benin · Niger · Nigeria · Guinea-Bissau. But we accept orders from any country, and there is no territory we will not supply.

Nothing in the terms below changes with the destination. Outside the region the buyer covers the installation team’s return travel, local accommodation and board, and entry formalities. That is stated up front because it is a real line in the budget rather than an afterthought, and it does not change the warranty.

Commercial terms

ItemValue
Manufacturing lead time10–18 weeks from confirmed order and receipt of advance payment
Warranty12 months from date of shipment
Spare partsDispatched alongside the machines
Design life15–20 years, main structure
Remote supportPLC diagnostics wherever internet is available
CertificationsNo ISO certification and no CE marking is claimed
Electrical basis400 V / 230 V, 3-phase, 50 Hz, TN-S; supply subject to interruption
LanguagesEnglish and French, documentation and operator interface
Response to an enquiryWithin one business day

Where we are as a company

We have one commissioned installation: a 900,000 kcal/h cashew shell burner firing the steam boiler at Premium Cashew Commodities Limited in The Gambia. It runs on empty cashew shell, the residue the factory already produces.

We have not yet built a drying line. The drying figures on this site are fully engineered design targets rather than measured results, and a mango demonstration unit is planned in Burkina Faso. Our specifications, fuel ranges and stated limitations are real — we would rather you knew exactly which parts are proven at the enquiry stage than after commissioning.

See the PCCL installation →

Frequently asked questions

Do you manufacture yourselves or resell?

We design, have the equipment built to our specification under our own quality control, then install and commission it ourselves. The same point of contact runs from sizing through to operator training, across the whole 200,000 to 900,000 kcal/h range. Nothing is drop-shipped from a catalogue.

Can I buy one machine rather than a whole plant?

Yes. A burner anywhere in the 200,000 to 900,000 kcal/h range, a hot air generator at 2,500 to 3,000 m³/h, or a set of chambers can each be supplied on its own. A good share of enquiries are exactly that — an existing oven, dryer or boiler that costs too much to run on diesel or LPG.

What support is there after installation?

Operator and maintenance training is part of the supply, spare parts are dispatched alongside the machines, and PLC diagnostics work remotely wherever the site has internet. Warranty runs 12 months from date of shipment. An engineer answers an enquiry within one business day.

Are you certified?

No ISO certification is claimed and no CE marking is claimed, and it is worth being direct about that. CE is a self-declared marking rather than a certification, so a supplier presenting it as one is telling you something about themselves. What we publish instead is the specification, the 3,200–5,100 kcal/kg fuel envelope and the exclusions.

Ask for a sizing study

Tell us what you are drying, in what quantity, and what fuel you have on site. We come back with a configuration and a fuel-consumption projection.